PRODUCE BLOCK PALLETS)
unstacked automatically. Then they are automatically fed into the fist nailing machine,
where the boards for the assembly with blocks are fed, in order to produce the top of the
4-way pallet. These half-ready pallets are turned over and fed into the second nailing
machine, where the bottom part of the 4-way pallet is made by nailing the bottom boards
to skis or perimeter bases. If necessary, this pallet is then chamfered, corner-cut and
branded and then stacked, either normally or nested.
.
Product type:
4-ways pallet with block and full perimeter pallets from 24x24 to 60x60 in; CP from 1 to
9, EURO and CHEP
Production: 360-420 pallets/hr. (theoretical; it can decrease according to pallet type and
dogs distance)
Personnel:
4/5operators
Changeover time:
60/90 min.
PRODUCE BLOCK PALLETS)
stringer, assembly of decks onto blocks, ski-boards and perimeter boards nailing. Decks
and the upper part of the 2-way pallet are produced in the deck nailing machine and
then fed by a buffer in the second nailing machine. The 2 different blocks are made in
the 2 block cutters or automatically unstacked if they are pressed type blocks. Then they
are placed (if necessary, turned over) into the nailing machine by the feeder. Here decks
are assembled to blocks. These semi-ready pallets are then turned over, so that ski-
boards are pushed into the next machine by transversal magazines and placed under
the chucks and nailed. For example, this machine produces the bottom decks of the 2-
way pallet. In the fourth optional nailing machine, the turned over pallets are assembled
to perimeter boards. This machine has an automatic riveting system for double deck
pallets, i.e. CP 7. After this, chamfering, corner cutting, branding and stacking are
carried out.
Product Type: stringer pallet, block and full perimeter pallets from 24x24 to 60x60 in; CP
from 1 to 9, EURO and paper pallets (free positioning of deck-boards, ski-boards and
blocks).
Production: 380-480 pal./hr. (theoretical; it can decrease according to pallet type and
dogs distance, i.e. EURO = 480 pcs./h)
Personnel: 3-4 operators
Changeover time: ca. 30 min. (with paper pallet, 1/-2 minutes upon request).
the Stringer pallets are produced inside the deck machine, then fed by a turn-over into
the second nailing machine to produce the bottom of the pallet. The line is completed
with chamfering and corner cutting machine, and the system to provide an either normal
or nested stacking. Line with great production output and quick changeovers.
Product Type: decks, Stringer, and Skid pallets
Production: 380-480 pallets/hr.
Personnel: 3 operators
Changeover Time: ca. 15/20 min.
BLOCK PALLETS)
the Stringer pallets are produced inside the deck machine, then fed by a turn-over into
the second nailing machine to produce the bottom of the pallet. The line is completed
with chamfering and corner cutting machine, and the system to provide an either normal
or nested stacking. Line with great production output and quick changeovers.
Product Type: decks, Stringer, and Skid pallets
Production: 380-480 pallets/hr.
Personnel: 3 operators
Changeover Time: ca. 15/20 min.
ELEMENTS FROM A STACK.)
We can offer selection scan systems to take away non-conform boards or pallets.
Boards are lifted up by a vacuum system (optional: mechanical grips or turned-over
unstacking), then they are positioned onto the chain guides, aligned and the separation
layer is removed. Then they are singularized and out of the nailing machine there is the
correct partition of deck-boards which are put into the magazine by a grip. Pressed
blocks are taken on the length side and put into the machine. Stacking with vacuum,
grip or turn-over.